New Delhi, June 5 (SocialNews.XYZ) The Bharat Heavy Electricals Ltd (BHEL) said on Wednesday that it has secured a Rs 3,500 crore order from Adani Power Limited for setting up a 1,600 MW thermal power plant (TPP) at Raipur, Chhattisgarh.
"Bharat Heavy Electricals Limited (BHEL) has received an order from Adani Power Ltd (APL) for setting up the 2x800 MW TPP at Raipur, Chhattisgarh," the public sector giant said in a regulatory filing.
"The nature of the order is supply of equipment – boiler, turbine generator and associated auxiliaries along with control and instrumentation and supervision of erection and commissioning," BHEL said.
Boiler and turbine generator are to be manufactured at BHEL’s Trichy and Haridwar plants, respectively, the company added.
Source: IANS
Gopi Adusumilli is a Programmer. He is the editor of SocialNews.XYZ and President of AGK Fire Inc.
He enjoys designing websites, developing mobile applications and publishing news articles on current events from various authenticated news sources.
When it comes to writing he likes to write about current world politics and Indian Movies. His future plans include developing SocialNews.XYZ into a News website that has no bias or judgment towards any.
He can be reached at gopi@socialnews.xyz
This website uses cookies.