Download logo
It is divided into four main sectors:
It has a length of 2 km and connects Saft El-Laban to Gamaet El-Dewal Al-Arabiya Street, passing through Sudan Street and Boulaq El-Dakrour metro station.
It starts from Gamaet El-Dewal Al-Arabiya Street to Warraq Ring Road with a distance of 5 km, passing through Sudan Street, 26th of July Axis and Al-Barageel Bridge.
It connects the Warraq Ring Road to Tahya Misr Axis, with a length of 3 km.
The President also inspected Ahmed Orabi Axis, which connects Al-Manshia Road to Ahmed Orabi Street, with a length of 11 km and a width of 6 traffic lanes in each direction. Ahmed Orabi Axis has been linked to the Ring Road and Kamal Amer Axis to be an alternative axis to ease traffic pressure on 26th of July Axis from the Ring Road to Lebanon Square and Sphinx Square in Mohandeseen.
The new axes in Giza aim to ease movement and reduce the time and distance within the governorate, in addition to linking it to nearby governorates, within the framework of the national plan for axes and roads across all governorates to accelerate and increase the rate of economic development, in line with the sustainable development strategy in the country.
Distributed by APO Group on behalf of The Presidency, The Arab Republic of Egypt.
This website uses cookies.